This table outlines current estimates of Physical Capacity, at system entry points, under normal operating conditions:
| Entry Point | Physical Capacity | Units = Kwh |
| Moffat | 344,530,000 | See note 1 |
| Inch | 83,550,000 | See note 2 |
The numbers are indicative.
These capacities are not expected to change in the immediate future
Note 1
Subject to review of existing compression facilities.
Note 2
The physical capacity is dependent on conditions in the Cork area of the network. For example, availability of capacity above 47,000,000 KWh is dependant on usage of gas in Cork area of network. Please refer to the Cork Area Load History for 2005/2006.
Note 3
The CSEP Nomination Limit at the Inch CSEP is 20,880,000kWh/day
(Ref: Code of Operations; Part D; 1.11.1)
Note 4
Information on Booked and Available Capacities for system entry points can be found under Transparency / Data Publication.